MAIN HOUSE EXTERIOR | BEFORE

SUMMER 2017

MAIN HOUSE INTERIOR | BEFORE

SUMMER 2017

MAIN HOUSE RENOVATION | DURING

SUMMER 2017-NOW

We did all the demo, refinishing the floors, and painting on our own, but we did hire out for a lot of services like electrical (total gut of knob and tube and replacement to code), some plumbing (moving the water heater to under the house and relocating the washer hookups), new back door installation, new gutters, new french drain around the house, and new HVAC unit. All of these things were all happening through the Fall 2017 and Winter 2018. We got to a place of "okay" to move in status by April 1, 2018 - so we did! 

As of December 2018, we still have to work:

  • REPLACE THE FLOORS IN THE MUDROOM

  • INSTALL TRIM IN THE MUDROOM

  • INSTALL BUILTINS - MUDROOM

  • BUILD OUT BEDROOM CLOSET

  • INSTALL WOOD STOVE

  • INSTALL BUILTINS - LIVING ROOM

  • INSTALL OPEN SHELVES - KITCHEN

  • FINISH POWER WASHING THE HOUSE

  • REBUILD THE FRONT PORCH

  • REPAIR / REPAINT THE BACK COVERED PORCH

  • OTHER SMALLER PROJECTS

We are always dreaming of our future bathroom and kitchen remodels, but for now - they are in great shape!

MAIN HOUSE | NOW